Lidoma

Concrete pouring of the ninth floor roof of block 46
Lidoma

The execution of the ninth-floor slab construction of Block 46.
Lidoma

The start of concrete pouring for the eighth floor slab of Block 46.
General Assembly of the Jam Gas Refinery Housing Cooperative

Holding the Annual General Meeting of 1403 (2024) of the Jam Gas Refinery Housing Cooperative at the Cooperative’s office location.
Lidoma

The execution of the fourth-floor slab construction of Block 37.