Lidoma

The execution of the eleventh-floor slab construction of Block 46.
Opal

Concrete pouring of the southern foundation.
Lidoma

Concrete pouring of the walls and columns of the fifth floor of Block 37
Lidoma

Concrete pouring of the fourth floor roof of block 37
Lidoma

The execution of the fourth-floor slab construction of Block 37.
Lidoma

The execution of the tenth-floor slab construction of Block 46.
Opal

The start of the second part of concrete pouring for the box raft foundation.
Lidoma

Concrete pouring of the ninth floor roof of block 46
Opal

The start of concrete pouring for the box raft foundation under Block B.
Lidoma

The execution of the ninth-floor slab construction of Block 46.
Opal

The completion of concrete pouring for the raft foundation of Block B in the Opal project.
Lidoma

The start of concrete pouring for the eighth floor slab of Block 46.